Of Bathrooms and Control Rooms
The tile is all but completed in the bathroom. The shower is completed as are all the wall tiles. The only thing left are a few pieces of cap tile and the pieces to finish off at the door.
I need to get the door frame up so the tile contractor can finish up in the next couple of days.
While I’m at it, I’ll go ahead and try to get the gypsum up in the kitchen area. That way, I’m that much closer to being ready to call the plumbers in for final connections and getting the final inspection for the plumbing.
I had actually hoped to be done with getting the MDF up in the rest of the studio, and could already be working on the gypsum. Alas, I’m just now getting the bottom row of MDF up on the walls.
This morning, I finished the control room!
I have several other pressing matters to attend to, including the door and gypsum for the bathroom.
Once those are done, I’ll be heading to the Iso Booth and Tracking Room to get that MDF up.
I know… need pix…