Merry HO HO GO!


OMG… Christmas season has definitely hit the area…

Rude drivers, congested parking lots, insane traffic, and last minute shopping husbands… yes, I went shopping yesterday.

I knew it was gonna be bad, but I had no idea just HOW bad…

I talked to Rod about having the concrete contractor cut a control joint in the junction of the hallway and tracking room. I talked to Josh at Audiolot about my gear being shipped and a coupla of other odds and ends. So, I got out and started “shopping” for the Mrs’ Christmas gift.

I was looking for a very specific item. I only had 3 places to go to look for it in the area. Fortunately, the first one was close to Lowe’s. So I went to Lowe’s and they cheerfully refunded the extra ceiling tile we over estimated on. WOO HOO! But the bad news was that the store didn’t have the present I sought.

I ended up going to the new local super strip mall. I have no idea who the traffic engineering firm was that designed the parking, but I’d LOVE to find the idiot in a dark alley. I got in the shopping center without much distress, but after that… O M G. It took almost an hour to get out of there!

I finally got back to Lowe’s to pick up 13 sheets of 5/8″ Fire Rated gypsum and some pressure treated lumber for sill and bottom plates for walls. THAT parking lot was almost as bad as the shopping center an hour and a half earlier.

I made it home… THANK GOD!

I left here at 9:30AM and didn’t make it back until 4:45PM. Any other time, I could have done all my shopping and been back here BEFORE noon. I burned every bit of daylight I had… I just hope “the boss” is happy with what I got. If not… I’m gonna shoot myself.

Needless to say, I didn’t get a single thing done yesterday.

I’ve got to get tracking gear ready for a remote session tonight at Liberty Showcase. Once I get that done, I’m gonna get some work done on the big opening. I want to get that framed in so I can get the doors taken down and the exterior done.

I don’t know that I can do it, but I’m going to try to order all the door hardware for the doors on Monday. I’ve really gotten caught off guard. I should have ordered the stuff WEEKS ago. I guess it’s just now sinking in that this studio is ACTUALLY gonna get built!

Information and Links

Join the fray by commenting, tracking what others have to say, or linking to it from your blog.


Other Posts
yeah, yeah, yeah…
A Bit Closer To The Edge

Write a Comment

Take a moment to comment and tell us what you think. Some basic HTML is allowed for formatting.

Reader Comments

Be the first to leave a comment!