Site Archives
Gettin’ Air Worthy
It’s all starting to get there for air…
The primer is on the ceiling and walls of the bathroom in anticipation of the plumbers coming today. (Mon) When I stopped in their shop Friday, I didn’t get confirmation for today, but their office manager said she’d try to get them here today, as there wasn’t anything […]
Gettin’ There From Here
The oak arrival was delayed until Wednesday afternoon.
It seems that a driver at the mill evidently got hurt, and put their deliveries to The Hardwood Store behind schedule…
Oh well, I utilized the time to start milling some of the walnut for trim work.
I’ve managed to get about 3/4 of the walnut trim on the […]
Steady as She Goes…
The big wall is done!
The “gozinta’ and “gozouta” cables get set in the big panel boxes. They’re a bit tricky, as they have to be flush with the finished surface AND match the surface of the box that is set in at the studs…. almost a full 3″ behind the finished surface…
Zooming in…. (kinda’)
I ended […]
It goes…
I’m a tad short on fabric for the walls after all…. arrrrgh. Went and picked up another 62 yards of material. I came home, sat down on the sofa and just konked out for 5 hours, so I ain’t gotten squat done today.
I’ve only gotten material up on the walls and a whopping 7 boards […]
Double WOOT!
My buddy G3 zipped down for an extended weekend. This is the progress so far;
The ceiling is a LOT more brutal than anyone would imagine. The angle of twist wants to push the oak outward as we progress from the highest point in the ceiling to the lowest… which makes trying to keep the spacing […]
Find It Quickly
Find what you're looking for quickly by using our keyword search. Can't find it? Try our links below.


