Site Archives
Trappin’ Sum Bass
Progress on the control room….
Got to seal up the HVAC penetrations as they are indeed, a penetration into the Control Room envelope…
The first layer is OSB, and the enclosure around the HVAC is indeed filled with Owens Corning R13 and R30. I also pulled the kraft paper off.
Fanaggelin’ in the OSB was at times, a […]
Happy Holiday’s!
I wish for everyone, everyday , but especially this Holy Season, a time of peace, a time of joy and time to be with family and friends.
I’m fortunate to know many good people in this world. Far more than I ever thought I would.
From here in North Carolina, to England, to California, Memphis, New Zealand, […]
Pickin’ up steam… well… hot water maybe
The plumbers got the Rennai water heater installed on the building today. They still have to make the connection to the propane tank, and the electrician needs to make the electrical, but for the most part, it’s in! The electrician called for the inspection of the PVC rough-in to the outbuildings… those passed!
Next on the […]
Pix! As Promised
I found this graffitti just after G Cubed escaped…. errr… Went home. At least it’ll be covered… if I can’t do anything else with it.
The lounge cabinets…
Trenchfoot Fun
These are from the other day when the electrician’s were here…
This is up by my future woodshop… My NEXT project once the studio’s open…
It’s going from the woodshop….
I’m planning on a lamp post going right here… then turning corner to the little storage building…
Then from the little storage building…
To the HVAC pad!
(At this point the […]
Things that make ya’ go; “Hmmmmm”
The HVAC guys must have stopped in on Wed w/o calling me… I walked in Friday morning and noticed the beginnings of the boots to the HVAC returns being cut in.
I was pretty surprised and wondered why they would have only gotten the boots formed, and only the insulation on one return hole trimmed out… […]
Find It Quickly
Find what you're looking for quickly by using our keyword search. Can't find it? Try our links below.


