Site Archives

Of Bathrooms and Control Rooms


The tile is all but completed in the bathroom. The shower is completed as are all the wall tiles.  The only thing left are a few pieces of cap tile and the pieces to finish off at the door.
I need to get the door frame up so the tile contractor can finish up in the […]

A Sad Day Indeed


I logged in over at The Womb yesterday about lunch time, as I usually do.
What I read stunned me beyond words…
A very dear friend had passed away….
———————————————————
This is to let all those who knew him, that Peter Abrams, my brother, passed away this week, at the age of 54, at his home in Jacksonville FLA, […]

A Little Bit Of….


Progress!
I was out of town over the weekend to photograph a wedding for a friend, so nothing got done until yesterday.
The tile contractor is making some headway; The shower is done! Tile’s in and its grouted. He started on the walls yesterday. He got three walls tiled, and I imagine he’ll finish getting the tile […]

Ooof


So much for backing off from the heavy stuff.
TheBoss and I went to get tile last night. The 12 small-ish tile squares for the bottom of the shower weren’t bad… It’s the 18 boxes of tile for the walls that were no fun.
I got help loading em’ in the truck… but there was no way […]

Out On the Tiles


Well… I called the tile guy yesterday morning and left him a message that we were finally ready to start tiling the bathroom. I figured that it might take a week or two to get on the list.
WRONG!
He had an opening from another client how failed to confirm yesterday. So, he bounced right on over […]

Grinding Away…


Well, unfortunately help didn’t arrive yesterday, so it was a slow grind getting the bathroom walls up.
I managed to get most of the Hardibacker board up. I got slowed down a bit because someone (me) forgot to think ahead and charge batteries for the saws and drills to cut holes for the plumbing. (DOH!)
Each sheet […]

A Pause For The Cause…


There’s no way that anyone can single handedly build a studio.
Amongst all the insanity, the one thing I’ve been kinda’ slack on is sayin’ “thanks”… and that ain’t right.
Thomas, Razor and G cubed, you guys are brave, and have been just crazy enough to step up to the plate and help. Thank you!
I know I […]

The downhill slide…………….


WOOOOOOOO HOOOOOOOOOO!
WE PASSED THE INSULATION INSPECTION!!!
No one can imagine how good I feel right now…. I’m exhausted, beat up, itchin’ like a brillo pad, sore and I was bitten by a black widow spider last week… but I’m about sittin’ on top of the world.
Time to take a quick look around and see where I’ve […]

Busy, Busy, Busy…. still!


WHEW! I feel like a brillo pad…
Yesterday morning (Tue) I went to put up the last coupla’ pieces of insulation and the T50 stapler finally gave up the ghost and completely fell apart… bonus.
They were having a coupla fun issues at the day gig, and I had to run in there for a few hours. […]

By the way… which one’s pink?


Insulation scraps have a place in the corner…

As of yesterday…
All of the lounge is done. There are about a dozen pieces left… mostly small filler pieces in the mic locker and a couple of pieces on the west wall by the air return.
Before I close that all in, I’m going to drag a C12 and […]