YET ANOTHER RED LETTER DAY!


Man… this is two days in a row!
The HVAC passed rough-in inspection!!
I’ve gotta start packing for a tracking session in Cinci this weekend, so not gonna get too far on things until next week… arrrg….
Oh well… It’s a benefit event, so it’s worth it;

Another Red Letter Day!


WOOOO HOOOO!
We passed the electrical rough-in inspection!!!!
There were only two comments… he wants Andy to be sure and put bushings on the chase nipples in the dimmer panel and that we will probably need a circuit for an emergency exit sign over the loading dock door.
Everything else passed with flying colors!
The HVAC guys were supposed […]

and Even Closer Yet!


WOOO HOOO!
We’re going for electrical rough-in inspection in the morning!
There might be a couple of issues, but not anything I’m too worried about…
The big one is the fact that we still haven’t pulled the 2.5″ conduits up into the equipment bays at the rear of the control room.
The small one is that I don’t have […]

Oh so close….


The HVAC is all but ready for rough-in inspection.
The guys actually worked on Friday to finish all but a couple of minor things. I think all they have are a couple of joints to tape and one bit of flex to connect to the fan in the bathroom.
There might be more, but I won’t know […]

Makin’ Some Headway


Well… the HVAC guys are really making some progress!
The duct is all but in… all the returns but one are attached and there are two feeds to the server room to be connected to the trunk.
The copper lines to the condenser’s are now in, and through the exterior wall.
Andy stopped by to pick up the […]

How Dry I Am


I’ve picked up a Delmhorst J-Lite wood moisture meter. I think it’ll be a sufficient meter for my needs… hope so anyway.
I did some random checking in the pile of lumber intended for the finish lumber in the studio, and most all of the wood has reached between 9 and 9.5 percent. (Allowing for temperature […]

I’m hot to get cool!


Not a fun update to make, but it’s the only news there really is…
The heat here has been BRUTAL for the past week. It’s forced the HVAC guys to start early and quit early. They’ve been starting about 7AM and bailing out about 3:30PM.
It’s ridiculous to expect the guys to work in 100 degree outside […]

You Light Up My Room


Andy and I met for a good long while last night going over a the lighting and dimmer installation.
Amongst the sweatdrops in our eyes at 7PM, we managed to get the task completed… not the installation, but the layout plan;
The filter packs require a conduit to enter/exit.
The dimmers themselves are pretty thick and the heat-sinks […]

Pix as Promised


The “Dirty Power” panel is on the right. The “Clean Power” panel is on the left. We’ll be taking #3 copper down the conduit that exits to bottom, out to the isolation transformer and bringing it  back in through the left panel’s conduit that comes in at the bottom.

Here, you can see the process (and […]